{"id":16890,"date":"2026-05-18T12:40:09","date_gmt":"2026-05-18T12:40:09","guid":{"rendered":"https:\/\/saharanews.in\/2026\/05\/18\/indian-railways-reveals-proposed-bullet-train-design\/"},"modified":"2026-05-18T12:40:09","modified_gmt":"2026-05-18T12:40:09","slug":"indian-railways-reveals-proposed-bullet-train-design","status":"publish","type":"post","link":"https:\/\/saharanews.in\/?p=16890","title":{"rendered":"Indian Railways reveals proposed bullet train design"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div>\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-131175452,imgsize-56994,width-400,height-225,resizemode-4\/untitled-design.jpg\" alt=\"First look: Indian Railways reveals proposed bullet train design\" title=\"This is how India's first bullet train would look (Courtesy: Indian Railways via ANI)\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<div class=\"Ta7d_ img_cptn\"><span title=\"This is how India's first bullet train would look (Courtesy: Indian Railways via ANI)\">This is how India&#8217;s first bullet train would look (Courtesy: Indian Railways via ANI)<\/span><\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p>NEW DELHI: <a href=\"https:\/\/timesofindia.indiatimes.com\/topic\/indian-railways\" styleobj=\"[object Object]\" class=\"\" commonstate=\"[object Object]\" frmappuse=\"1\">Indian Railways<\/a> has unveiled the design of the country\u2019s first bullet train, set to run between Mumbai and Ahmedabad, displaying an image of the train at the Ministry of Railways in the national capital.<span class=\"id-r-component br\" data-pos=\"4\"\/><span class=\"strong\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">Also Read: <\/span><a href=\"https:\/\/timesofindia.indiatimes.com\/city\/bengaluru\/indias-first-swadeshi-bullet-train-to-roll-out-by-april-2027\/articleshow\/130522712.cms\" styleobj=\"[object Object]\" class=\"strong\" commonstate=\"[object Object]\" frmappuse=\"1\">India\u2019s first \u2018swadeshi\u2019 bullet train to roll out by April 2027<\/a><span class=\"id-r-component br\" data-pos=\"7\"\/>\u201cA picture of the country\u2019s first proposed bullet train has been displayed at the Ministry of Railways. The picture has been installed at Gate Number 4,\u201d ANI quoted an Indian Railways statement as saying.<span class=\"id-r-component br\" data-pos=\"9\"\/><span class=\"id-r-component br\" data-pos=\"11\"\/>In February, railways minister Ashwini Vaishnaw informed the Lok Sabha that the 508-km Mumbai-Ahmedabad High Speed Rail (MAHSR) Project would pass through Maharashtra, Gujarat and the Union Territory of Dadra and Nagar Haveli. <!-- -->The route would have 12 stations \u2014 Mumbai, Thane, Virar, Boisar, Vapi, Billimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad, and Sabarmati.<span class=\"id-r-component br\" data-pos=\"16\"\/>For the MAHSR project, foundation work has been completed at eight stations in Gujarat (Vapi, Bilimora, Surat, Bharuch, Anand, Vadodara, Ahmedabad, and Sabarmati). Work is under way at Thane, Virar, and Boisar in Maharashtra, while excavation at the Bandra Kurla Complex (BKC) station is nearing completion.<span class=\"id-r-component br\" data-pos=\"19\"\/>Seventeen river bridges have been completed, while work is at an advanced stage on four major bridges \u2014 Narmada, Mahi, Tapti and Sabarmati \u2014 in Gujarat. Construction is also under way on four river bridges in Maharashtra.<span class=\"id-r-component br\" data-pos=\"21\"\/>At BKC, excavation work is about 91% complete, and construction has begun on the under-sea tunnel section, with 4.8 km between Ghansoli and Shilphata already completed.<span class=\"id-r-component br\" data-pos=\"23\"\/>According to Indian Railways, the project would boost indigenous high-speed rail capabilities under the Make in India initiative, with Integral Coach Factory (ICF), Chennai, and BEML Limited, Bengaluru, jointly developing train sets with a design speed of 280 kmph.<span class=\"id-r-component br\" data-pos=\"26\"\/><span class=\"strong\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">Land acqusition progress<\/span><span class=\"id-r-component br\" data-pos=\"28\"\/>According to Vaishnaw&#8217;s written reply in the Lok Sabha, the entire 1,389.5 hectares of land required for the MAHSR project has been acquired.<span class=\"id-r-component br\" data-pos=\"30\"\/>The minister said land acquisition was carried out in accordance with applicable laws, and affected persons were compensated under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, along with relevant state policies. <!-- -->Rehabilitation and resettlement measures, including additional benefits and solatium, were implemented in coordination with the two state governments.<span class=\"id-r-component br\" data-pos=\"34\"\/>Vaishnaw also stated that the MAHSR corridor has been designed for high-frequency operations with substantial passenger-carrying capacity, while ticket pricing is proposed to remain competitive with existing rail and air travel options.<span class=\"id-r-component br\" data-pos=\"36\"\/>For passenger safety, the project has been designed with support from Japanese Railways, though it has been customised to suit Indian requirements and climatic conditions.<span class=\"id-r-component br\" data-pos=\"38\"\/><\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/business\/india-business\/first-look-indian-railways-reveals-proposed-bullet-train-design\/articleshow\/131175342.cms\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This is how India&#8217;s first bullet train would look (Courtesy: Indian Railways via ANI) NEW DELHI: Indian Railways has unveiled the design of the country\u2019s first bullet train, set to run between Mumbai and Ahmedabad, displaying an image of the train at the Ministry of Railways in the national capital.Also Read: India\u2019s first \u2018swadeshi\u2019 bullet&#8230;<\/p>\n","protected":false},"author":1,"featured_media":16891,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-16890","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business"],"_links":{"self":[{"href":"https:\/\/saharanews.in\/index.php?rest_route=\/wp\/v2\/posts\/16890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/saharanews.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/saharanews.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/saharanews.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/saharanews.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16890"}],"version-history":[{"count":0,"href":"https:\/\/saharanews.in\/index.php?rest_route=\/wp\/v2\/posts\/16890\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/saharanews.in\/index.php?rest_route=\/wp\/v2\/media\/16891"}],"wp:attachment":[{"href":"https:\/\/saharanews.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/saharanews.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/saharanews.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}